S E W E R S Y S T E M M A I N T E N A N C E THROUGHOUT THE YEAR, WE REGULARLY MAINTAIN AND INSPECT THE SEWER SYSTEM TO IDENTIFY AND REPAIR DEFECTS BEFORE PROBLEMS OCCUR AND TO HELP REDUCE THE CHANCE OF SEWER OVERFLOWS. 6 WA S T E WAT E R A N N UA L R E P O R T 2 0 1 8 – 2 0 1 9 ANNUAL TASK FY 2019 TOTALS Sewer Line Video Inspection 316,800 feet Sewer Line Acoustic Inspection 254,107 feet Sewer Line Cleaning 712,800 feet Sewer Line Leak Detection/Smoke Testing 13,426 feet Sewer Easement Maintenance 768,407 feet Manhole Inspections 2,653 Manhole Repairs 55 Sewer Line Repairs 24 Sewer Cleanout Repairs 293