TOC

Wastewater Annual Report 2020-2021

Issue link: http://townofcary.uberflip.com/i/1403564

Contents of this Issue

Navigation

Page 5 of 15

S E W E R S Y S T E M M A I N T E N A N C E Throughout the year, we regularly maintain and inspect the sewer system to identify and repair defects before problems occur. This also helps to reduce the chance of sewer overflows. ANNUAL TASK FY 2021 TOTALS Sewer Line Video Inspection 193,905 feet Sewer Line Acoustic Inspection 547,532 feet Sewer Line Cleaning 615,190 feet Sewer Line Leak Detection/Smoke Testing 428,580 feet Sewer Easement Maintenance 501,344 feet Manhole Inspections 2,583 Manhole Repairs 30 Sewer Line Repairs 51 Sewer Cleanout Repairs 613 6 WA S T E WAT E R A N N UA L R E P O R T 2 0 2 0 – 2 0 2 1

Articles in this issue

view archives of TOC - Wastewater Annual Report 2020-2021