C A RY, N O RT H C A R O L I N A A N N U A L WAST E WAT E R R E P O R T 2 0 2 3 5
DAILY WASTEWATER
COLLECTION,
ACTUAL VERSUS
CAPACITY
(MILLION GALLONS PER DAY)
FY 2023 BUDGETED FUNDS
FOR THE ENTIRE WASTEWATER SYSTEM
$27.5M
1,006
MILES
OF SEWER LINES
BILLION GALLONS
OF WASTEWATER WAS TRANSPORTED
AND TREATED ACROSS THE SYSTEM
7.08
5 0
10
15
20
NORTHERN
CARY
SOUTHERN
CARY
WESTERN
WAKE
6.93
5.34
7.12
SEWER LINE DIAMETER:
INCHES
4
FEET
5
TO