TOC

TOC_WastewaterReport_8_15_23_ FINAL WEB

Issue link: http://townofcary.uberflip.com/i/1506268

Contents of this Issue

Navigation

Page 5 of 15

C A RY, N O RT H C A R O L I N A A N N U A L WAST E WAT E R R E P O R T 2 0 2 3 6 ANNUAL TASK FY 2023 TOTALS SEWER LINE VIDEO INSPECTION 288,323 feet SEWER LINE ACOUSTIC INSPECTION 672,092 feet SEWER LINE CLEANING 613,792 feet SEWER EASEMENT MAINTENANCE 645,243 feet MANHOLE INSPECTIONS 1,979 MANHOLE REPAIRS 38 SEWER LINE REPAIRS 48 SEWER CLEANOUT REPAIRS 122 S E W E R S Y ST E M M A I N T E N A N C E Throughout the year, we regularly maintain and inspect the sewer system to identify and repair defects before problems occur. This also helps to reduce the chance of sewer overflows.

Articles in this issue

view archives of TOC - TOC_WastewaterReport_8_15_23_ FINAL WEB