C A RY, N O RT H C A R O L I N A A N N U A L WAST E WAT E R R E P O R T 2 0 24 6 S E W E R S Y ST E M M A I N T E N A N C E Throughout the year, we regularly maintain and inspect the sewer system to identify and repair defects before problems occur. This also helps to reduce the chance of sewer overflows. ANNUAL TASK FY 2024 TOTALS SEWER LINE VIDEO INSPECTION 349,536 feet SEWER LINE ACOUSTIC INSPECTION 399,379 feet SEWER LINE CLEANING 586,080 feet SEWER LINE LEAK DETECTION/SMOKE TESTING 103,488 feet SEWER EASEMENT MAINTENANCE 744,691 feet MANHOLE INSPECTIONS 2,342 MANHOLE REPAIRS 4 SEWER LINE REPAIRS 88 SEWER LINE REHABILITATION 12.65 inch diameter-miles SEWER CLEANOUT REPAIRS 197