New Infrastructure Added Over the third quarter, the Town added the following new infrastructure, measured in linear feet (LF). Water line 13,739 LF 12,563 LF Sanitary sewer line 2,402 LF Reclaimed water line 90 LF Public greenways 8,058 LF Streets During Lazy Daze, a new record was set for shuttle passenger trips: 17,247 passenger trips between two different satellite parking locations in Town. C-Tran/GoCary Cary Tennis Park Expansion Projected completion date: Summer 2017