ANNUAL TASK FY 2018 TOTALS Sewer Line Video Inspection 287,101 feet Sewer Line Acoustic Inspection 157,826 feet Sewer Line Cleaning 735,368 feet Sewer Line Leak Detection/Smoke Testing 5,320 feet Sewer Easement Maintenance 1,150,924 feet Manhole Inspections 2,155 Manhole Repairs 22 Sewer Line Repairs 57 Sewer Cleanout Repairs 622 S E W E R S Y S T E M M A I N T E N A N C E THROUGHOUT THE YEAR, WE REGULARLY MAINTAIN AND INSPECT THE SEWER SYSTEM TO IDENTIFY AND REPAIR DEFECTS BEFORE PROBLEMS OCCUR AND TO HELP REDUCE THE CHANCE OF SEWER OVERFLOWS. 6 WA S T E WAT E R A N N UA L R E P O R T 2 0 1 7 – 2 0 1 8