TOC

Cary Wastewater Report

Issue link: https://townofcary.uberflip.com/i/1538671

Contents of this Issue

Navigation

Page 4 of 15

C A RY, N O RT H C A R O L I N A A N N U A L WAST E WAT E R R E P O R T 2 0 25 5 DAILY WASTEWATER COLLECTION, ACTUAL VERSUS CAPACITY (MILLION GALLONS PER DAY) FY 2025 BUDGETED FUNDS FOR THE ENTIRE WASTEWATER SYSTEM $32M 1,016 MILES OF SEWER LINES BILLION GALLONS OF WASTEWATER WAS TRANSPORTED AND TREATED ACROSS THE SYSTEM 7.44 5 0 10 15 20 NORTHERN CARY SOUTHERN CARY WESTERN WAKE 7.18 5.28 7.93 SEWER LINE DIAMETER: INCHES 4 FEET 5 TO

Articles in this issue

view archives of TOC - Cary Wastewater Report